0309-8958003 WhatsApp Mon – Sat, 9:00 AM – 7:00 PM Free site survey in Sargodha →
UPS & Power Backup for Security Systems · Sargodha

Security that does not switch off with WAPDA.

Load-shedding is the most common reason a security system fails when it matters. We size UPS, batteries and solar-compatible backup so cameras, recorders, fire panels, gates and networks keep running through every outage.

Built into every system we design; also retrofitted to systems installed by others.

Who it's for

Every CCTV siteHousing society gatesFactories & millsServer roomsShops & banksFarms & remote sites
What we install

Inside a UPS & Power Backup system

Online UPS

Double-conversion UPS for recorders, servers and network racks.

Line-interactive UPS

Economical protection for small camera systems and shops.

Battery banks

Maintenance-free, gel and lithium batteries sized for your outage hours.

Battery-backed PoE

PoE switches on UPS so IP cameras stay up.

Solar integration

Backup that works with your existing solar inverter.

Automatic voltage regulators

Protect equipment from low and fluctuating voltage.

Monitoring

Alerts when the UPS is on battery or the battery is failing.

Maintenance

Battery testing and replacement under AMC.

Brands for this system

  • APC
  • Eaton
  • Vertiv
  • Homage
  • Inverex
Credentials →

How a UPS & Power Backup project runs

  1. 01

    Site survey

    Free visit. We walk the premises, note entry points, cable routes, power availability and what your insurer or building code requires.

    1 day
  2. 02

    Design & BOQ

    Camera or device placement drawing, bill of quantities with brand and model, itemised quote with no hidden costs.

    2–3 days
  3. 03

    Installation

    Certified technicians, neat conduit and trunking, labelled cabling, tested terminations.

    2–10 days
  4. 04

    Commissioning & training

    Every device tested, mobile app set up on your phones, staff trained, handover document signed.

    1 day
  5. 05

    AMC & support

    Optional annual maintenance with scheduled visits, priority response and spare-part stock.

    Ongoing

Standards we design to

  • Runtime calculated from your outage pattern
  • Load measured, not guessed
  • Batteries tested at every AMC visit

Quote for UPS & Power Backup

We reply within one working day. No spam, no sharing your number.

Questions we get asked

How long will my cameras run on backup?

It depends on the load and battery size. A typical 8-camera system with a 2 kVA UPS and two batteries runs 4 to 6 hours; we size for your actual outage schedule.

Can I add backup to a system someone else installed?

Yes. This is one of our most common jobs.

Does the fire alarm need a separate backup?

Fire panels have internal standby batteries, which we size and test. A UPS is added for connected PA and integration equipment.

Can the backup work with my solar system?

Yes. We integrate with hybrid inverters or install a dedicated UPS on the solar-backed circuit.

How do I know when the battery is weak?

Monitored UPS units send alerts, and AMC visits include a battery load test.

Quote for UPS & Power Backup

Free, no obligation, about 45 minutes on site. Our engineer carries photo ID.

Call WhatsApp Free survey